SELECTION AND INSTALLATION

SELECT ONE OF THE
FOLLOWING CATEGORIES

INSTALLATIONS OF CLEANOUTS

CI-300, CI-302 y CI-305

1. Protect the exposed surface of the cleanout with adhesive tape that won’t leave residue
2. Cut the ceramic tiles, marble, concrete, porcelain tiles or any types of flooring materials 3-4mm larger than the size of the cleanout. The cut-out will be either circular or square according to the model of the cleanout
3. It is recommended that the pipe or PVC cleanout access is 5 cm below the floor level
4. Place the cleanout in the opening done in step 2. Make sure it is level with the ground. Grout or cement around the cleanout.
5. Remove the adhesive tape once the grout has dried and the project is ready to b turned over to the customer.

CI-303 y CI-304

To install cleanouts CI-303 and CI-304, follow the same instructions used for the installation of drains.

CI-301

1. Protect the exposed surface of the cleanout with residue-free adhesive tape
2. Cut the ceramic tiles, marble, concrete, porcelain tiles or any type of flooring materials 3-4 mm larger than the size of cleanout.
3. Thoroughly clean the outside of the PVC pipe and the inside of the PVC coupling of the cleanout
4. Apply PVC glue to the outside of the PVC pipe and the inside of the coupling and insert the PVC pipe into the coupling
5. Tighten or loosen the cleanout by screwing the cover to adjust its height to be flush with the floor
6. Seal around the cleanout with Grout or cement
7. After the grout has dried, the protective adhesive should be removed moments before handing over the finalized project to the client.